Projects That Speak for Themselves
With years of hands-on experience working with multifamily communities across Florida, we've built a track record of quality, reliability, and results.

200-Unit Community Exterior Repaint
Complete exterior repaint including all buildings, breezeways, and common areas.

Full Unit Turnovers - Luxury Complex
Complete unit turnovers including painting, cleaning, repairs, and flooring updates.

Dehumidifier and Air Movers in Action
Professional dehumidifier and air movers deployed for moisture extraction and drying in apartment unit.

Commercial Kitchen Demolition & Restoration
Full-scale demolition and remediation of a commercial kitchen — crew in PPE suits removing damaged materials, flooring, and debris ahead of full restoration.

Common Area Flooring Upgrade
Vinyl plank flooring installation throughout all hallways and common areas.

Exterior Building Refresh
Full exterior repaint with pressure washing and trim repair.

Interior Clubhouse Common Area Painting
Professional interior painting of clubhouse common areas with proper prep and protection.

Multifamily Gym Interior Painting
Interior painting of community gym with full equipment protection and accent wall finish.

Thermal Imaging Moisture Scan – Early Detection for Multifamily Units
Thermal scan showing moisture spread behind the wall. Essential for fast decision-making in multifamily buildings, helping prevent mold, structural damage, and tenant complaints.

Apartment Complex Flooring
Laminate and vinyl flooring installation across entire apartment community.

Tile Repair – Finished Result
Seamless tile repair with matching wood-look porcelain tiles — clean, professional finish ready for move-in.

Kitchen Tile Repair – In Progress
Partial tile removal and replacement in kitchen area, matching existing wood-look tile with precision.

Hallway Tile Repair – Demo & Replace
Full tile demo and replacement in unit hallway — removed damaged tiles and reinstalled matching wood-look porcelain.

Door Trim Installation – Unit Repair
PrimeOne technician using a nail gun for precise door trim installation — fast, clean, professional finish ready for move-in.

Shower Waterproofing – Durock & RedGard
Durock cement board installed and sealed with RedGard waterproofing membrane — proper substrate prep before tile setting.

Shower Tile – Completed Renovation
Finished shower with large-format marble-look wall tile and hex mosaic floor — full rebuild from studs to move-in ready.

Kitchen Backsplash & Cabinet Renovation
Full kitchen renovation featuring new tile backsplash, white shaker cabinets, quartz countertops, and wood-look plank flooring — move-in ready finish.

Exterior Repaint – Building Side View
Fresh exterior repaint on multifamily building — clean white painted finish with contrasting trim, railings, and stairs. Worker on ladder completing final touch-ups.

Exterior Repaint – Full Building Corner
Completed exterior repaint showing full building corner — uniform painted finish, freshly painted stairs, railings, and trim throughout both floors.

Breezeway & Walkway Repaint
Freshly painted breezeway and second-floor walkway — walls, floor coating, ceiling, and trim all completed with clean, uniform finish throughout.

Stairwell & Entry Repaint
Exterior stairwell fully repainted with fresh floor coating, matching wall and railing finish — clean entry ready for residents.

Full Building Exterior – Completed Repaint
Wide view of completed multifamily building exterior repaint — consistent color scheme across all units, balconies, and common areas with fresh landscaping.

Exterior Clubhouse Repaint – Front Entry
Modern clubhouse exterior freshly repainted — crisp white painted exterior with clean trim, window frames, and caulk lines. Ladder on site mid-touch-up during final coat.

Exterior Clubhouse Repaint – Side View
Side angle of completed clubhouse exterior repaint — smooth painted finish, painted soffit and fascia, and clean edge detail around sliding glass doors and signage.

Wood Deck & Bench Staining
Slatted wood deck bench freshly stained with a rich dark finish — surface prep complete, safety barriers in place while stain cures. Beautiful contrast against the brick walkway.

Patio Ceiling & Tongue-and-Groove Staining
Tongue-and-groove wood patio ceiling stained deep espresso — ladder in place for detailed overhead work. Clean exterior walls and decorative columns preserved throughout.

Exterior Doors & Trim Staining
French entry doors and surrounding wood trim refinished with deep dark stain — paint thinner and supplies staged on site. Rich finish against freshly painted white exterior.

Community Gym Repaint – Blue Accent Wall
Multifamily gym repainted with vibrant blue accent walls — equipment fully protected during painting. Bright, energizing finish that elevates the resident fitness experience.

Community Gym Repaint – Neutral Tone Refresh
Full gym repaint in neutral gray tones with crisp white trim — ceiling, walls, and columns all finished. Clean, professional look that complements the equipment layout.

Playground Installation – Rubber Mulch Surface
Playground equipment installation with full rubber mulch safety surface — modular play structure set in a South Florida community with pool area in the background.

Pressure Washing – Sidewalk Crew
PrimeOne crew pressure washing community sidewalks — removing buildup, stains, and algae to restore clean, safe walkways throughout the property.

Pressure Washing – Surface Cleaner in Action
Technician using a commercial surface cleaner attachment for uniform pressure washing results — efficient coverage on large hard-surface areas with streak-free finish.
Bathroom Shower Remodel
See exactly how PrimeOne transforms a deteriorated multifamily shower from demo to move-in ready — every step, done right.

Original Condition
Old shower showing mold growth at the base, deteriorated grout, and aging fixtures — a common condition in multifamily units needing a full rebuild.

Durock & Pan Liner
Old tile and substrate fully removed. USG Durock cement board installed on all walls, and a waterproof shower pan liner set on the floor — the proper foundation for a lasting shower.

RedGard Waterproofing
RedGard liquid waterproofing membrane rolled over all Durock surfaces, creating a continuous moisture barrier before any tile is set. This step is critical to prevent water intrusion behind walls.

Large-Format Tile Setting
Large-format marble-look porcelain tiles set with precision leveling clips and spacers. A RUBI tile saw on site ensures clean cuts around fixtures and corners.

Final Tile – No Door
Completed marble-look tile work before door installation — seamless large-format walls and white hex mosaic floor tile with clean grout lines throughout.

Tile Complete – Door Test Fit
All wall tiles set and grouted, hex mosaic floor tile installed. Sliding shower door test-fitted to confirm alignment before final installation.

Completed Shower
Finished product with sliding glass door installed — stunning marble-look tile, hex mosaic floor, and clean chrome hardware. Move-in ready and built to last.
Ready to Start Your Project?
Let us bring the same quality and attention to detail to your community.
Request a Quote