    Full Shower Rebuild & Unit Turn — Fort Lauderdale, FL

    Full down-to-the-studs shower rebuild and apartment turn for a Class A multifamily community in Fort Lauderdale — completed in 6 working days and re-rented the following week.

    Mid-rise multifamily1 unit (recurring portfolio)6 working days
    Finished marble-look porcelain shower with hex mosaic floor and sliding glass door in a Fort Lauderdale, FL apartment

    FL Mold Licensed

    MRSR5531 · MRSA5456

    EPA Lead-Safe

    Certified firm

    Multifamily Focus

    Built for operations

    Insured

    COI on request

    Documented Work

    Photo + written reports

    Before / After

    Documented transformation

    Before
    Before

    Original failing shower in a Fort Lauderdale apartment showing mold growth at the base and deteriorated grout before remediation · Completed marble-look porcelain shower rebuild in a Fort Lauderdale apartment with sliding glass door installed

    Project story

    A Fort Lauderdale multifamily community needed a recurring vendor that could rebuild a failing shower without holding up the unit turn. PrimeOne managed the full project end-to-end — performing the demo, waterproofing, tile, and paint scopes ourselves, with any plumbing rough-in and valve work executed by our licensed plumbing partner under our coordination. Durock and a waterproof pan liner went in on day one, every substrate was sealed with RedGard liquid membrane before tile, large-format porcelain was set around the valve, and a hex mosaic floor was installed with leveling clips. The unit was repainted, hardware swapped and punched out by day six — leasing had it back on the market the following Monday.

    Scope of work

    • Demo of failing shower down to metal studs and pan
    • USG Durock cement board and waterproof pan liner installed
    • RedGard liquid waterproofing membrane applied over all substrates
    • Large-format marble-look porcelain wall tile + hex mosaic floor tile
    • Prime and full repaint of bathroom and adjacent hallway
    • Sliding glass shower door install, hardware swap, punch-list completion

    Project gallery

    Durock cement board and waterproof pan liner installed during a multifamily shower rebuild in Fort Lauderdale
    Completed wall tile and hex mosaic floor before door installation in a multifamily unit in Fort Lauderdale

    Services used on this project

    Need the same scope on your property? Read how we deliver each service for multifamily communities across South Florida.

    "PrimeOne turned a failing shower into a fully remodeled, move-in-ready unit in under a week. Communication was constant and the finish quality is what we expect on our Class A assets."

    Property Manager

    Fort Lauderdale, FL

    Common Questions

    Questions about this Fort Lauderdale project

    Vendor Compliance

    Built for multifamily vendor requirements

    PrimeOne is set up the way multifamily operators want their vendors set up — licensed, insured, documented and easy to onboard into your compliance system.

    COI on file, every time

    General Liability and Workers' Comp certificates issued to your management company and additional insureds before mobilization.

    Florida-licensed mold work · EPA Lead-Safe

    Mold Remediator MRSR5531 and Mold Assessor MRSA5456, plus EPA Lead-Safe certification. Regulated trades such as plumbing, electrical and structural work are performed by licensed partner contractors.

    Vendor portal compatible

    We work inside the vendor systems multifamily operators already use — work-order docs, photo upload and invoicing on your terms.

    Resident-aware crews

    Uniformed crews, parking coordination, posted access plans and same-day reopen on stairwells and breezeways so leasing keeps moving.

    Want this same playbook on your property?

    Same-week scheduling across Fort Lauderdale and surrounding Broward County.